Yara – Scw Return Header Replacement Project
Wenco was awarded the Design, Installation, Testing and Commissioning of the YARA SCW Return Header Replacement Project
WENCO Scope
- Design and Engineering works
- Stress analysis of SCW GRE Piping
- Supply, Pre-fabrication, Installation, Testing and Commissioning of NOV FGS GRVe Pipes and Fittings
- SCW Return Header- 20″ to 48″ GRVe Piping System
- Hydrostatic testing
- Installation of In-line Valves & Bolt Torqueing
- Installation of all pipe fixings and pipe supports
- Project team of 40+ personnel
- No LTI for 25,000 man hours