Yara scw refurbishment project (nov-fgs)

Project Key Facts
Project Owner:

YARA

Project Name:

SCW Refurbishment Project

Client:

Clough - AMEC

Yara scw refurbishment project (nov-fgs)

Wenco was awarded the Installation, testing and Pre-Commissioning of Wheatstone Underground and Aboveground Pipework

project image
project image
project image

WENCO Scope

  • Supply, Pre-fabrication, Installation, Testing, Civil Works and Pre-commissioning of NOV FGS GRE & GRVe Pipes and Fittings
  • Sea Cooling water – 6” to 72” Piping System
  • Fresh Cooling water – 6” to 24” GRE Piping
  • Removal of Existing GRE & GRVe Piping
  • Installation of In-line valves & Bolt Torqueing.
  • Installation of all pipe fixings to pipe supports.
  • Installation, removal and reinstallation of specialty items and in-line instrumentation, including pressure safety valves and control valves, as required, after performing testing, flushing and Mechanical Completion