Yara scw refurbishment project (nov-fgs)
Wenco was awarded the Installation, testing and Pre-Commissioning of Wheatstone Underground and Aboveground Pipework
WENCO Scope
- Supply, Pre-fabrication, Installation, Testing, Civil Works and Pre-commissioning of NOV FGS GRE & GRVe Pipes and Fittings
- Sea Cooling water – 6” to 72” Piping System
- Fresh Cooling water – 6” to 24” GRE Piping
- Removal of Existing GRE & GRVe Piping
- Installation of In-line valves & Bolt Torqueing.
- Installation of all pipe fixings to pipe supports.
- Installation, removal and reinstallation of specialty items and in-line instrumentation, including pressure safety valves and control valves, as required, after performing testing, flushing and Mechanical Completion