Chemical Injection Skid & Fire water replacement

Project Key Facts
Project Owner:

YARA

Project Name:

CPP1, CPP2, Waste Water Discharge, Fire Water Mist

Client:

YARA

Chemical Injection Skid & Fire water replacement

Wenco was awarded multiple works including Waste Water Discharge Line, Fire Water Mist Line, Acid Line Replacement, Condensers blasting and painting of both CPP1 & CPP2

project image
project image

WENCO Scope

  • Design, Supply and Install of GRE Pipes & Fittings
  • Design, Supply and Install of Chemical Injection Skid Systems
  • Design, Supply and Install of SS316 & SS304L Pipes & Fittings
  • QA/QC & NDT Inspection Works
  • Engineering design & Support
  • Blasting (Dry & Wet Abrasive)
  • Painting and Coating Works
  • Concrete Repair Works
  • Acid Line Skid Replacement with CPVC
  • Fabricate and Install Fire Water Mist Line SS
  • Fabricate and Install Waste Water Discharge Line (WWD)