Major Present Projects:

Tan Burrup Project – Above Ground Pipe Works (Phase 1 and 2)


The Tan Burrup Project involves construction of an ammonium nitrate production facility on Karratha in Western Australia.

Wenco was appointed to supply a team to manage the installation of above ground metallic and non-metallic piping works.

Project Management, Structural Work, Painting, Hydrotesting, Valve & Equipment Reinstatement, Flushing, Supply, Handling, Storage, Quality Control, Installation, Testing &Handover of Phase-1 GRE Piping Work. Includes various sizes between DN150 & DN1000, more than 1400 joints.


Wenco team provides the following services:

  • Project Management
  • Procurement
  • QC/QA
  • Piping fabrication work
  • Piping construction work
  • Piping support installation
  • Installation of valves and equipment
  • Painting
  • Hydro testing

Project Key Facts

Project Owner: Yara Pilbara Pty Ltd

Client: Técnicas Reunidas

Values: AUD $ XXXXX


Tan Burrup Project – Below Ground Pipe Works


The Tan Burrup Project involves construction of an ammonium nitrate production facility on Karratha in Western Australia.

Wenco was appointed to supply a team to manage the installation of below ground non-metallic piping works.

Wenco team provides the following services:

  • Project Management
  • QC/QA
  • Procurement
  • Piping fabrication work
  • Piping construction work
  • Installation of valves supports
  • Installation of valves
  • Hydro testing

Project Key Facts

Project Owner: Yara Pilbara Pty Ltd

Client: WBHO Civil

Values: AUD $ XXXXX


Ichthys LNG Project - Offshore Desalination Plant


The Ichthys LNG Offshore desalination plant involves the provision of ship mounted plants which will supply potable and process water to crews involved in the recovery of liquefied natural gas (LNG) and hydrocarbons from the Ichthys field in the Timor sea

Wenco was appointed to supply, fabricate and install GRE piping spools.

Wenco team provides the following services:

  • Supply of GRE piping and fittings
  • Pre-fabrication of GRE piping spools
  • QC/QA
  • Installation of the prefabricate GRE piping spools on skids mounted plants
  • Hydro testing

Project Key Facts

Project Owner: INPEX

Client: Osmoflo

Values: AUD $ XXXXX


AGC (Goodwyn Platform)

Supply, Prefabrication/ Prespooling, QC, Hydro-Testing, Spooling the Pipes on skids etc.


YARA Fertilizer Turnaround 2014

Various Repair & Modification work at site during the Planned Shutdown (August 2014). This included RTRP Underground Freshwater Modification Work (inclusive of Civil Work), TanTie In & Desal Tie-In Work etc.


Major HDPE Projects

  • Fortescue Minerals Group - Cloudbreak and Christmas Creek
  • Newmont - Boddington, Tanami, Jundee
  • BHP Billion - Finucane Island, Area C
  • Rio Tinto- Leighton Ngarda JV/Hope Downs 4
  • Rio Tinto/ Roy Hill - Roy Hill
  • Kalgoorlie Consolidated Gold Mines - SuperPit
  • CITIC Pacific - Sino Iron
  • Cliffs Natural Resources - Koolyanobbing
  • Alcoa of Australia Limited - Pinjarra
  • Newcrest- GR Engineering/ Telfer
  • Anglogold Ashanti Australia Ltd - Sunrise Dam, Tropicana
  • Kimberly Diamond Company NL - Ellendale

Onshore & Offshore Projects

Major Past Projects:

Karratha Gas Plant

Numerous supply and installation packages including below GRE ground firewater mains, oily water drains, sewerage lines & potable water (over 10,000m)


Burrup Fertilizers

Supply and installation of underground firewater mains, cooling water and potable water lines (over 6,000m)


Pluto LNG Plant

Numerous supply and installation packages including below ground GRE firewater mains, oily water drains sewerage lines & potable water. Above ground GRE firewater lines on the LNG Load Out Jetty and effluent discharge lines within the Effluent Treatment Plant (over 10,000m)


Monadelphous - Shenton Park AWT Plant

Fabrication, installation and testing of 50 to 250mm 7000M pipe work.Supply of various pipes and fittings, labour for the continuity testing.


North Rankin A Platform and Goodwyn A Platform

GRE Potable water lines, Deluge Skid Strainer Drain Lines, Firewater Line Upgrades, Deck Drains Replacement, GRE Hazardous Drain Lines


Northern Endeavour FPSO

Northern Endeavour FPSO Various GRE spool work and repair work packages.


Ravensthorpe Nickel Project

GRE, GRP & GRVE Brine Lines, Brine Pumps, Sea Water Intake Pumping Station, Sea Water Supply Lines and Hot Acidic Slurry Lines (over 5000m)


Water Corp Desalination Plant

Pump Riser Spool installations and testing.


Water Corporation Kwinana Water Reclamation Plant

GRE & HDPE water lines installations, Hydrotesting and mechanical services.

Various Gold Mine GRE, GRP and HDPE

Installations works (includes Hydrotesting services)


Hi-Smelt & BP Refinery

Effluent & Water Return Lines.


Desalination Plant

GRE & Stainless Steel Pipe Work Fabrication and Installation.


Our Client Base


Key Advantages


Abraison Resistant and Corrosion - Proof Piping Systems Provides Install-It and Forget-It Reliability

  • No Maintenance: Impervious to corrosionn and resistant to chemical attackcaused by acids,solvents, and bases, eliminating the need for protective coating, wraps or catholic protection.
  • Low Installation Costs: Lightweight construction enables easy installation, reducing personnel and equipment needs.
  • Improved Flow Capacity: Smooth interior pipe surface resists scaling and eliminates corrosion.
  • Long Service Life: Calculated design life of 20 years, with an actual service life of over 30 years.

Reliability: "Install-It and Forget-It" performance.



More Projects

[click the link below]

...view more Project Achievements
Wenco PTY LTD
CONNECT WITH US
Fill out the form below to contact us or request one of our representatives to contact you. Thank you!
Thank You. We will contact you as soon as possible.

Call us at
+61 8 9267 5500

Services Inquiry Form

GET YOUR MONTHLY FIX
of Wenco Group News
Simply drop your details in below and we’ll send the latest Wenco news to your inbox each month.